top of page

This customer wanted a complete makeover for her hallway bathroom.  Upon our initial inspection of the project we saw that the existing plastic wall paneling was seperating at the joints and that mold and mildew were present.  We then turned to the floor, where it was serverely damaged and rotted out in the front of the tub where most people enter and exit the tub. Finally, we turned to the walls, made of sheet rock that had major holes and needed a lot of reparing.

 

     After consulting with our interior designer, the customer decide that she wanted to tile both the walls surrounding the tub and the floor with a matching brick layout.  The walls was to be designed with an accent.  She further decided to have new shower fixtures installed along with a new vanity.

 

     Finally, we decided to rip out all of the sheetrock and install, finish and paint the bathroom.

VONDA101.jpg
VONDA100.jpg
VONDA103.jpg
VONDA106.jpg
VONDA105.jpg
VONDA104.jpg
VONDA109.jpg
VONDA118.jpg
VONDA117.jpg
VONDA114.jpg
VONDA127.jpg
VONDA149.jpg
VONDA128.jpg
VONDA143.jpg
VONDA144.jpg
VONDA148.jpg
VONDA124.jpg
VONDA116.jpg
VONDA135.jpg
VONDA123.jpg
VONDA122.jpg
VONDA121.jpg
VONDA113.jpg
VONDA110.jpg
VONDA108.jpg
VONDA148.jpg
VONDA149.jpg
VONDA144.jpg
VONDA143.jpg
VONDA135.jpg
VONDA113.jpg
VONDA110.jpg
VONDA128.jpg
VONDA127.jpg
VONDA124.jpg
VONDA123.jpg
VONDA122.jpg
VONDA121.jpg
VONDA119.jpg
VONDA118.jpg
VONDA117.jpg
VONDA114.jpg
VONDA152.jpg
VONDA125.jpg
VONDA150.jpg
VONDA108.jpg
VONDA149.jpg
VONDA146.jpg
VONDA145.jpg
VONDA144.jpg
VONDA154.jpg
VONDA153.jpg
VONDA155.jpg

New Tile Masters And More

Professional Home Improvement Services

© 2023 by THE BUILDER. Proudly created with Wix.com 

  • w-facebook
  • Twitter Clean
  • w-googleplus
bottom of page