This customer wanted a complete makeover for her hallway bathroom. Upon our initial inspection of the project we saw that the existing plastic wall paneling was seperating at the joints and that mold and mildew were present. We then turned to the floor, where it was serverely damaged and rotted out in the front of the tub where most people enter and exit the tub. Finally, we turned to the walls, made of sheet rock that had major holes and needed a lot of reparing.
After consulting with our interior designer, the customer decide that she wanted to tile both the walls surrounding the tub and the floor with a matching brick layout. The walls was to be designed with an accent. She further decided to have new shower fixtures installed along with a new vanity.
Finally, we decided to rip out all of the sheetrock and install, finish and paint the bathroom.
![]() |
|---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |